Skip to content

System design

We develop individual solutions that take account of the property’s architecture, purpose and technical requirements.

Climate equipment and installation details
Tailored selection
Every solution is designed for the property.
Careful installation
We work cleanly and take care of your interior.
Warranty
We provide a warranty on equipment and installation.
Service support
We stay in touch after the project is complete.

Comfort starts with the right solution

We develop individual solutions that take account of the property’s architecture, purpose and technical requirements.

The specialists at ProClimate select equipment individually for each property, taking into account its floor area, architecture, occupancy and operating hours.

A complete range of services

We believe that quality engineering should go unnoticed. A properly designed climate system does not need constant attention — it simply provides comfort every day.

Equipment selection
We select climate systems to suit the floor area, budget and characteristics of the property.
Installation
We carry out professional installation in accordance with manufacturers’ recommendations.
Equipment replacement
We help upgrade outdated systems without unnecessary costs.
Servicing
We carry out regular maintenance to keep equipment working reliably.
Diagnostics
We quickly identify the causes of faults and resolve them.
Automation
We configure remote control and Smart Home integration.

Real properties.
Real results.

More projects
Air conditioning for an office interiorAir conditioning
  • Multi-split system
  • Concealed pipework
Ventilation equipment for an interiorVentilation
  • Supply and extract ventilation
  • Heat recovery
Climate engineering — house bgSystem design
  • Coordinated heating and ventilation
  • Equipment and distribution planning
More projects

Frequently asked questions

What you need to know

In most cases, installation is completed within one working day.

Yes, in many cases. We assess pipe routes, drainage, power and access before proposing an approach that minimises disruption to finished rooms.

Capacity depends on room size, insulation, glazing, solar gain, occupancy and use. A site assessment is more reliable than choosing equipment by floor area alone.

Yes. Filters, coils, drains and operating checks need attention according to usage and the manufacturer’s guidance. Agree an appropriate maintenance plan for your system.